Commercial/Industrial Solar Installation
- Home
- Projects
- Commercial/Industrial Solar Installation
This factory's roof is saving AED 31,300 a year.
Most commercial solar pitches lead with projections. Here’s what an actual installation produced for a furniture manufacturing factory. In April 2026, we installed a 94.4kW On-Grid Zero Export solar system on a factory in Sharjah. We connected it to live monitoring from day one.
Here's what made up that result:
- AED 2,610 - AED 4500 saved every month. AED 31,300 a year. Over 680% ROI over 25 years.
- 5,800 kWh generated per month (30-day average)
- 45% of total electricity use offset.
- 3.2 year payback period - after that, every dirham saved is profit.
The equipments used:
- Solar Panels - Jinko Tier 1 (25 years warranty).
- Invertor - Huawei 110kW SUN2000-110KTL-M2 (5 years warranty).
- Smart Meter - This is used for Zero Export
What this means if you’re evaluating solar for your own factory. If your facility is in an industrial zone across Sharjah, Ajman, Ras Al Khaimah, Umm Al Quwain, Fujairah, or Dubai, and your monthly electricity bill runs above AED 8,000, this case study is a realistic reference point for what a similarly sized system could do. The exact output depends on your roof size, orientation, and your facility’s actual consumption pattern, so your numbers will differ. But the structure, the relationship between installed capacity, monthly generation, and payback period, will look comparable.
The most useful next step is a free site assessment against your actual utility bills and roof, not a generic percentage-based quote.
