Solar Panel Installation
- Home
- Dubai
DEWA Certified Experts
Go solar in Dubai and benefit from DEWA’s Shams Dubai program — net metering that credits you for excess electricity. Whether you own a villa, warehouse, or commercial building, we handle all DEWA approvals and deliver turnkey solar solutions.
Shams Dubai Program
Dubai leads the UAE with its Shams Program — allowing property owners to install solar panels and benefit from true net metering. Generate clean electricity, export excess to DEWA’s grid, and earn credits that dramatically reduce your bills. Credits automatically roll over each month, giving you maximum savings all year.
How it works :
Result :
Available Solar Solutions in Dubai
Dubai properties can benefit from all three solar configurations.
On-Grid Solar with Net Metering
Connect to DEWA, use solar during the day, and export any excess back to the grid for credits that offset your night usage. No batteries needed — net metering acts as your virtual storage.
Best for : Villas, apartments & commercial properties wanting maximum savings with the fastest payback.
Payback : 3.5–5 years | Bill reduction: up to 95%.
How it Works
Hybrid Solar with Battery + Net Metering
Solar panels plus battery storage plus DEWA grid connection. Store solar for evening use AND earn credits from any remaining excess — the best of all worlds.
Best for : Properties that want backup power during outages on top of maximum bill savings.
Payback : 5–7 years
How it Works
Off-Grid Solar
Fully independent from DEWA — solar + battery + generator with no grid connection.
Best for : Remote Dubai properties without DEWA access. Rarely needed in Dubai but available where required.
How it Works
Dubai Advantage: Unlike other Emirates, DEWA credits roll over monthly — so every kWh your panels produce is never wasted, even on low-consumption days.
Not sure which system suits your property? We'll assess your site for free. 📞 +971 56 753 0007 | info@solarmarket.ae
Our DEWA Approval Process
We handle 100% of Shams Dubai paperwork:
- Application preparation — Technical drawings, equipment specs, property documents
- DEWA submission — Online application with all required documentation
- Technical review coordination — Handle DEWA queries and revisions
- Site inspection scheduling — Coordinate DEWA inspector visit
- Bi-directional meter installation — DEWA replaces meter for net metering
- Final approval & activation — System goes live with net metering
- Timeline: 4–8 weeks from application to approval.
- Your involvement: Minimal — we handle everything
Why Choose Us?
Free site visit & roof inspection
Your solar system exports excess electricity to DEWA's grid through a bi-directional meter.
DEWA bill analysis (12 months)
Your solar system exports excess electricity to DEWA's grid through a bi-directional meter.
Custom zero-export system design
Your solar system exports excess electricity to DEWA's grid through a bi-directional meter.
Detailed savings calculation
Your solar system exports excess electricity to DEWA's grid through a bi-directional meter.
Complete proposal in 48 hours
Your solar system exports excess electricity to DEWA's grid through a bi-directional meter.
Zero obligation
Your solar system exports excess electricity to DEWA's grid through a bi-directional meter.
FAQs
Q: Can I get financing for solar in Dubai?
Yes. Several UAE banks offer green loans (DIB, ADCB, Mashreq, ENBD). Typical terms: 3-5 years at 4-7% interest. Monthly loan payments often covered by DEWA savings (AED 400-600/month for villas).
Q: How much roof space do I need?
~6-7 m² per kW. Examples: 5 kW = ~35 m² | 8 kW = ~55 m² | 10 kW = ~70 m². We account for shading, obstructions (AC units, tanks), and optimal orientation.
Q: What happens during sandstorms?
Panels work but at 30-60% output during storm (temporary). Main issue is dust accumulation over time. Regular cleaning every 4-6 weeks essential to maintain performance.
Q: Is solar worth it without net metering?
Dubai HAS net metering (Shams Dubai) — that's what makes it so valuable! Every kWh you produce either reduces your consumption or earns credits. This is why Dubai delivers the best solar ROI in UAE.
Q: Do I need batteries with net metering?
No. Net metering acts as "virtual storage" — grid banks your excess for night use via credits. Batteries only needed if you want backup power during outages. Most Dubai customers choose on-grid (no battery) for best ROI.
Service Areas
Downtown Dubai, Dubai Marina, Arabian Ranches, Dubai Hills Estate, JBR, Business Bay, JLT, Discovery Gardens, Dubai Silicon Oasis, Dubai Investment Park, Al Barsha, Al Quoz, Jebel Ali, Dubai South, Palm Jumeirah, Jumeirah, All Dubai areas.
